
0 votes
2015
1h 20m
Building on the success of various Commando Raids during 1941, Headquarters Combined Operations moved up the scale of size and complexity by electing to attack and deny the only dry dock that could take a German battleship for repairs, the Normandie Dock at St Nazaire on France's Atlantic coast. However the port was miles up a well defended estuary. To deliver an explosive charge big enough to demolish the massive lock gates, an old ship HMS Campbeltown was converted to look like a German destroyer, so as to bluff their way into the heart of the port where it would ram the lock gates.The Commandos were to fan out across the dock to demolish pumps and winding gear to comprehensively deny the dock to the Kriegsmarine for a significant period of time. Under cover of dark the bluff worked well, up to a point, Campbeltown rammed the gates but the Commandos found that the Germans were alert and had great difficulty in reaching their objectives.
Status
Released
Release date
November 9, 2015
Budget
—
Revenue
—
Language
English

The Soviet Story
2008
Why We Fight: Prelude to War
1942
They Shall Not Grow Old
2018
Father Soldier Son
2020
2000 Meters to Andriivka
2025
Virunga
2014
Korengal
2014
The Bloody Hundredth
2024
For Sama
2019
The Battle of San Pietro
1945
We Stand Alone Together: The Men of Easy Company
2001
The Age of Stupid
2009